View vehicle applications
Fitment notes and restrictions
Description
The Radium Engineering Universal CNC Machined Coolant Header Tank, 1240ml is a fluid reservoir for the listed engine-bay or cooling-system configuration. Confirm capacity, cap rating, hose connections, mounting location, clearance, and fluid compatibility.
Key Features
- This Radium Engineering coolant header tank is CNC machined in a 2-piece design with a fluid level viewing window, giving builders 1240ml of fluid capacity for custom cooling system layouts.
- Yes, the 2-piece design includes a fluid level viewing window.
- This tank is CNC machined for a precision fit and finish.
- Yes, cooling system installation should be performed by someone experienced with custom fabrication and fitting torque.
Fitment
This is a universal or configuration-specific fuel-system component. Confirm dimensions, port and thread standards, hose size, fuel compatibility, pressure range, and mating components before ordering.
Specifications
| Brand | Radium Engineering |
|---|---|
| Manufacturer Part Number | 20-2270 |
| Product Type | Coolant Reservoirs |
| Condition | New |
What's Included
- The Radium Engineering component identified by manufacturer part number 20-2270
- Only fittings, seals, brackets, wiring, or hardware specifically listed for this exact configuration
Brand Information
Radium Engineering develops fuel delivery, crankcase ventilation, fluid-control, and motorsport plumbing components. Port standards, pressure range, fuel compatibility, mounting, and vehicle fitment remain manufacturer-part-number specific.
Related Parts
Frequently Asked Questions
Will this reservoir fit my engine bay?
Confirm dimensions, mounting points, cap clearance, hose-port location, heat exposure, and service access with the vehicle before ordering.
Can this component be used with E85 or other ethanol blends?
Fuel compatibility depends on the exact seals, element, hose, and component materials. Confirm the manufacturer specifications for every part in the system before using ethanol fuel.
Should this fuel-system part be installed professionally?
Professional installation is recommended whenever the work involves tank removal, custom plumbing, wiring, pressure adjustment, fabrication, or motorsport safety requirements.
What should be checked before the first startup?
Verify every connection, seal, fastener, hose route, electrical circuit, and pressure setting. Prime and pressure-test the complete system, then correct any leak before starting the engine.
Installation Instructions
Depressurize the fuel or fluid system, disconnect power when required, work in a ventilated area away from ignition sources, and protect open lines from contamination. Assemble every connection with the correct seal and torque method, secure plumbing and wiring away from heat and abrasion, then prime and pressure-test the complete system before operation.
Translation missing: en.boa_product_preview.universal_fit
Translation missing: en.boa_product_preview.universal_fit_message




